Panel Information
| Barcode | 6221-PY-20-TF |
| Panel Number | PY-20-TF |
| Site | Charles St (#6221) |
| Plot | — |
| Position | PY |
| Floor | 3rdF |
| Block | — |
| Length | 2398 mm |
| CDT File | Z:\6221_Charles St_-3rdF-3rdF PY\6221_Charles St_-3rdF-89-2787\FRAMEPY-20-TF.CDT |
| Status | Complete |
| Created | 03/07/2026 08:28:29 |
| Completed | 03/07/2026 09:23:52 |
Station Timeline
Framing Station
Printed: 08:28:29
Insulation Boarding
Arrived: 08:37:48
· Left: 08:38:34
· 45s
Nailing Bridge
Arrived: 08:38:34
· Left: 09:19:41
· 2467s
Paper Application
Arrived: 09:19:41
· Left: 09:20:10
· 29s
Panel Flipping
Arrived: 09:20:10
· Left: 22:00:17
· 218406s
Insulation Filling
Not yet reached
OSB Glue Application
Not yet reached
Paper Application 2
Not yet reached
Exit Line to Windows
Not yet reached
All Scan Events
4 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 08:37:48 | Insulation Boarding | Scanner 1 | 6221-PY-20-TF | Entry |
| 08:38:34 | Nailing Bridge | Scanner 2 | 6221-PY-20-TF | Entry |
| 09:19:41 | Paper Application | Scanner 3 | 6221-PY-20-TF | Entry |
| 09:20:10 | Panel Flipping | Scanner 4 | 6221-PY-20-TF | Entry |