Panel Information
| Barcode | 6517-EX-1-FF-13 |
| Panel Number | EX-1-FF |
| Site | New Mill_BL_PL42-43_FF_EX (#6517) |
| Plot | 42-43 |
| Position | EX |
| Floor | FF |
| Block | — |
| Length | 3589 mm |
| CDT File | Z:\6517_New Mill_BL_PL42-43_FF_EX\6517_New Mill_BL_PL42-43_FF_EX---219-2605\FRAMEEX-1-FF.CDT |
| Status | Complete |
| Created | 28/09/2026 11:09:18 |
| Completed | 01/10/2026 08:23:02 |
Station Timeline
Framing Station
Printed: 11:09:18
Insulation Boarding
Arrived: 12:01:00
· Left: 13:54:34
· 6814s
Nailing Bridge
Arrived: 13:54:34
· Left: 14:40:32
· 2757s
Paper Application
Not yet reached
Panel Flipping
Not yet reached
Insulation Filling
Not yet reached
OSB Glue Application
Arrived: 14:40:32
· Left: 08:23:02
· 236549s
Paper Application 2
Not yet reached
Exit Line to Windows
Not yet reached
All Scan Events
3 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 12:01:00 | Insulation Boarding | Scanner 1 | 6517-EX-1-FF-13 | Entry |
| 13:54:34 | Nailing Bridge | Scanner 2 | 6517-EX-1-FF-13 | Entry |
| 14:40:32 | OSB Glue Application | Scanner 6 | 6517-EX-1-FF-13 | Entry |