Panel Information
| Barcode | 6517-EX-3-FF-12 |
| Panel Number | EX-3-FF |
| Site | New Mill_BL_PL42-43_FF_EX (#6517) |
| Plot | 42-43 |
| Position | EX |
| Floor | FF |
| Block | — |
| Length | 4199 mm |
| CDT File | Z:\6517_New Mill_BL_PL42-43_FF_EX\6517_New Mill_BL_PL42-43_FF_EX---219-2605\FRAMEEX-3-FF.CDT |
| Status | Complete |
| Created | 28/09/2026 13:59:41 |
| Completed | 01/10/2026 08:23:02 |
Station Timeline
Framing Station
Printed: 13:59:41
Insulation Boarding
Arrived: 15:55:36
· Left: 07:40:48
· 56711s
Nailing Bridge
Arrived: 07:40:48
· Left: 08:29:30
· 2922s
Paper Application
Arrived: 08:29:30
· Left: 11:36:26
· 11215s
Panel Flipping
Not yet reached
Insulation Filling
Not yet reached
OSB Glue Application
Not yet reached
Paper Application 2
Not yet reached
Exit Line to Windows
Arrived: 11:36:26
· Left: 11:36:26
All Scan Events
4 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 15:55:36 | Insulation Boarding | Scanner 1 | 6517-EX-3-FF-12 | Entry |
| 07:40:48 | Nailing Bridge | Scanner 2 | 6517-EX-3-FF-12 | Entry |
| 08:29:30 | Paper Application | Scanner 3 | 6517-EX-3-FF-12 | Entry |
| 11:36:26 | Exit Line to Windows | Scanner 8 | 6517-EX-3-FF-12 | Entry |