Panel Information
| Barcode | 6517-PY-2-FF-12 |
| Panel Number | PY-2-FF |
| Site | New Mill_BL_PL42-43_FF_PY (#6517) |
| Plot | 42-43 |
| Position | PY |
| Floor | FF |
| Block | — |
| Length | 1101 mm |
| CDT File | Z:\6517_New Mill_BL_PL42-43_FF_PY\6517_New Mill_BL_PL42-43_FF_PY---89-2610\FRAMEPY-2-FF.CDT |
| Status | Complete |
| Created | 29/09/2026 08:49:04 |
| Completed | 01/10/2026 08:23:02 |
Station Timeline
Framing Station
Printed: 08:49:04
Insulation Boarding
Arrived: 08:55:34
· Left: 09:40:47
· 2713s
Nailing Bridge
Arrived: 09:40:47
· Left: 09:45:55
· 307s
Paper Application
Arrived: 09:45:55
· Left: 11:51:18
· 7522s
Panel Flipping
Not yet reached
Insulation Filling
Arrived: 11:51:18
· Left: 08:23:02
· 160303s
OSB Glue Application
Not yet reached
Paper Application 2
Not yet reached
Exit Line to Windows
Not yet reached
All Scan Events
4 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 08:55:34 | Insulation Boarding | Scanner 1 | 6517-PY-2-FF-12 | Entry |
| 09:40:47 | Nailing Bridge | Scanner 2 | 6517-PY-2-FF-12 | Entry |
| 09:45:55 | Paper Application | Scanner 3 | 6517-PY-2-FF-12 | Entry |
| 11:51:18 | Insulation Filling | Scanner 5 | 6517-PY-2-FF-12 | Entry |