Panel Information
| Barcode | 6221-PY-91-TF |
| Panel Number | PY-91-TF |
| Site | Charles St (#6221) |
| Plot | — |
| Position | PY |
| Floor | 3rdF |
| Block | — |
| Length | 1410 mm |
| CDT File | Z:\6221_Charles St_-3rdF-3rdF PY\6221_Charles St_-3rdF-89-2787\FRAMEPY-91-TF.CDT |
| Status | Complete |
| Created | 03/07/2026 09:54:42 |
| Completed | 03/07/2026 11:51:21 |
Station Timeline
Framing Station
Printed: 09:54:42
Insulation Boarding
Arrived: 10:34:33
· Left: 10:44:14
· 580s
Nailing Bridge
Arrived: 10:44:14
· Left: 11:10:33
· 1579s
Paper Application
Arrived: 11:10:33
· Left: 11:14:38
· 244s
Panel Flipping
Arrived: 11:14:38
· Left: 22:00:17
· 211539s
Insulation Filling
Not yet reached
OSB Glue Application
Not yet reached
Paper Application 2
Not yet reached
Exit Line to Windows
Not yet reached
All Scan Events
4 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 10:34:33 | Insulation Boarding | Scanner 1 | 6221-PY-91-TF | Entry |
| 10:44:14 | Nailing Bridge | Scanner 2 | 6221-PY-91-TF | Entry |
| 11:10:33 | Paper Application | Scanner 3 | 6221-PY-91-TF | Entry |
| 11:14:38 | Panel Flipping | Scanner 4 | 6221-PY-91-TF | Entry |