Panel Information
| Barcode | 6510-EX-10-GF |
| Panel Number | EX-10-GF |
| Site | Cefn Cribwr_BL_PL3-6_GF_EX (#6510) |
| Plot | 3-6 |
| Position | EX |
| Floor | GF |
| Block | — |
| Length | 3743 mm |
| CDT File | Z:\6510_Cefn Cribwr_BL_PL3-6_GF_EX\6510_Cefn Cribwr_BL_PL3-6_GF_EX---140-2603\FRAMEEX-10-GF.CDT |
| Status | Complete |
| Created | 05/10/2026 07:36:18 |
| Completed | 05/10/2026 12:42:47 |
Station Timeline
Framing Station
Printed: 07:36:18
Insulation Boarding
Arrived: 08:31:29
· Left: 10:25:07
· 6817s
Nailing Bridge
Arrived: 10:25:07
· Left: 11:50:30
· 5122s
Paper Application
Arrived: 11:50:30
· Left: 12:42:47
· 3137s
Panel Flipping
Not yet reached
Insulation Filling
Not yet reached
OSB Glue Application
Not yet reached
Paper Application 2
Not yet reached
Exit Line to Windows
Arrived: 10:53:07
· Currently here
All Scan Events
4 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 08:31:29 | Insulation Boarding | Scanner 1 | 6510-EX-10-GF | Entry |
| 10:25:07 | Nailing Bridge | Scanner 2 | 6510-EX-10-GF | Entry |
| 11:50:30 | Paper Application | Scanner 3 | 6510-EX-10-GF | Entry |
| 10:53:07 | Exit Line to Windows | Scanner 8 | 6510-EX-10-GF | Entry |