Panel Information
| Barcode | 6510-PY-8-GF |
| Panel Number | PY-8-GF |
| Site | Cefn Cribwr_BL_PL3-6_GF_PY (#6510) |
| Plot | 3-6 |
| Position | PY |
| Floor | GF |
| Block | — |
| Length | 2398 mm |
| CDT File | Z:\6510_Cefn Cribwr_BL_PL3-6_GF_PY\6510_Cefn Cribwr_BL_PL3-6_GF_PY---89-2603\FRAMEPY-8-GF.CDT |
| Status | Complete |
| Created | 07/10/2026 09:18:19 |
| Completed | 07/10/2026 14:42:03 |
Station Timeline
Framing Station
Printed: 09:18:19
Insulation Boarding
Not yet reached
Nailing Bridge
Arrived: 09:49:14
· Left: 10:54:38
· 3924s
Paper Application
Arrived: 10:54:38
· Left: 13:48:35
· 10436s
Panel Flipping
Not yet reached
Insulation Filling
Arrived: 13:48:35
· Left: 14:41:16
· 3161s
OSB Glue Application
Arrived: 14:41:16
· Left: 14:42:03
· 46s
Paper Application 2
Not yet reached
Exit Line to Windows
Not yet reached
All Scan Events
4 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 09:49:14 | Nailing Bridge | Scanner 2 | 6510-PY-8-GF | Entry |
| 10:54:38 | Paper Application | Scanner 3 | 6510-PY-8-GF | Entry |
| 13:48:35 | Insulation Filling | Scanner 5 | 6510-PY-8-GF | Entry |
| 14:41:16 | OSB Glue Application | Scanner 6 | 6510-PY-8-GF | Entry |