Panel Information
| Barcode | 6510-PY-15-GF |
| Panel Number | PY-15-GF |
| Site | Cefn Cribwr_BL_PL3-6_GF_PY (#6510) |
| Plot | 3-6 |
| Position | PY |
| Floor | GF |
| Block | — |
| Length | 1615 mm |
| CDT File | Z:\6510_Cefn Cribwr_BL_PL3-6_GF_PY\6510_Cefn Cribwr_BL_PL3-6_GF_PY---89-2603\FRAMEPY-15-GF.CDT |
| Status | Complete |
| Created | 07/10/2026 10:26:15 |
| Completed | 08/10/2026 07:24:25 |
Station Timeline
Framing Station
Printed: 10:26:15
Insulation Boarding
Not yet reached
Nailing Bridge
Arrived: 11:04:17
· Left: 11:30:09
· 1552s
Paper Application
Arrived: 11:30:09
· Left: 15:17:54
· 13664s
Panel Flipping
Not yet reached
Insulation Filling
Not yet reached
OSB Glue Application
Arrived: 15:17:54
· Left: 07:24:25
· 57991s
Paper Application 2
Not yet reached
Exit Line to Windows
Not yet reached
All Scan Events
3 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 11:04:17 | Nailing Bridge | Scanner 2 | 6510-PY-15-GF | Entry |
| 11:30:09 | Paper Application | Scanner 3 | 6510-PY-15-GF | Entry |
| 15:17:54 | OSB Glue Application | Scanner 6 | 6510-PY-15-GF | Entry |