Panel Information
| Barcode | 6510-PY-5-GF-2 |
| Panel Number | PY-5-GF |
| Site | Cefn Cribwr_BL_PL7-10_GF_PY (#6510) |
| Plot | 7-10 |
| Position | PY |
| Floor | GF |
| Block | — |
| Length | 1896 mm |
| CDT File | Z:\6510_Cefn Cribwr_BL_PL7-10_GF_PY\6510_Cefn Cribwr_BL_PL7-10_GF_PY---89-2603\FRAMEPY-5-GF.CDT |
| Status | Complete |
| Created | 07/10/2026 12:20:33 |
| Completed | 08/10/2026 10:46:00 |
Station Timeline
Framing Station
Printed: 12:20:33
Insulation Boarding
Not yet reached
Nailing Bridge
Arrived: 13:43:14
· Left: 14:22:19
· 2344s
Paper Application
Arrived: 14:22:19
· Left: 09:34:53
· 69154s
Panel Flipping
Not yet reached
Insulation Filling
Not yet reached
OSB Glue Application
Arrived: 09:34:53
· Left: 10:35:58
· 3664s
Paper Application 2
Arrived: 10:35:58
· Left: 10:46:00
· 602s
Exit Line to Windows
Not yet reached
All Scan Events
4 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 13:43:14 | Nailing Bridge | Scanner 2 | 6510-PY-5-GF-2 | Entry |
| 14:22:19 | Paper Application | Scanner 3 | 6510-PY-5-GF-2 | Entry |
| 09:34:53 | OSB Glue Application | Scanner 6 | 6510-PY-5-GF-2 | Entry |
| 10:35:58 | Paper Application 2 | Scanner 7 | 6510-PY-5-GF-2 | Entry |