Panel Information
| Barcode | 6510-PY-20-GF-2 |
| Panel Number | PY-20-GF |
| Site | Cefn Cribwr_BL_PL7-10_GF_PY (#6510) |
| Plot | 7-10 |
| Position | PY |
| Floor | GF |
| Block | — |
| Length | 1012 mm |
| CDT File | Z:\6510_Cefn Cribwr_BL_PL7-10_GF_PY\6510_Cefn Cribwr_BL_PL7-10_GF_PY---89-2649\FRAMEPY-20-GF.CDT |
| Status | Complete |
| Created | 07/10/2026 14:19:35 |
| Completed | 08/10/2026 11:45:44 |
Station Timeline
Framing Station
Printed: 14:19:35
Insulation Boarding
Arrived: 14:32:01
· Left: 14:43:17
· 676s
Nailing Bridge
Arrived: 14:43:17
· Left: 15:47:43
· 3865s
Paper Application
Arrived: 15:47:43
· Left: 09:34:42
· 64019s
Panel Flipping
Not yet reached
Insulation Filling
Arrived: 09:34:42
· Left: 11:08:19
· 5616s
OSB Glue Application
Not yet reached
Paper Application 2
Arrived: 11:08:19
· Left: 11:45:44
· 2245s
Exit Line to Windows
Not yet reached
All Scan Events
5 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 14:32:01 | Insulation Boarding | Scanner 1 | 6510-PY-20-GF-2 | Entry |
| 14:43:17 | Nailing Bridge | Scanner 2 | 6510-PY-20-GF-2 | Entry |
| 15:47:43 | Paper Application | Scanner 3 | 6510-PY-20-GF-2 | Entry |
| 09:34:42 | Insulation Filling | Scanner 5 | 6510-PY-20-GF-2 | Entry |
| 11:08:19 | Paper Application 2 | Scanner 7 | 6510-PY-20-GF-2 | Entry |