Panel Information
| Barcode | 6510-EX-1-FF |
| Panel Number | EX-1-FF |
| Site | Cefn Cribwr_BL_PL3-6_FF_EX (#6510) |
| Plot | 3-6 |
| Position | EX |
| Floor | FF |
| Block | — |
| Length | 2580 mm |
| CDT File | Z:\6510_Cefn Cribwr_BL_PL3-6_FF_EX\6510_Cefn Cribwr_BL_PL3-6_FF_EX---140-2620\FRAMEEX-1-FF.CDT |
| Status | Complete |
| Created | 09/10/2026 07:18:13 |
| Completed | 12/10/2026 14:13:00 |
Station Timeline
Framing Station
Printed: 07:18:13
Insulation Boarding
Not yet reached
Nailing Bridge
Arrived: 11:52:28
· Left: 12:03:29
· 661s
Paper Application
Arrived: 12:03:29
· Left: 09:16:22
· 249173s
Panel Flipping
Not yet reached
Insulation Filling
Not yet reached
OSB Glue Application
Arrived: 09:16:22
· Left: 14:13:00
· 17797s
Paper Application 2
Not yet reached
Exit Line to Windows
Arrived: 14:20:48
· Currently here
All Scan Events
4 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 11:52:28 | Nailing Bridge | Scanner 2 | 6510-EX-1-FF | Entry |
| 12:03:29 | Paper Application | Scanner 3 | 6510-EX-1-FF | Entry |
| 09:16:22 | OSB Glue Application | Scanner 6 | 6510-EX-1-FF | Entry |
| 14:20:48 | Exit Line to Windows | Scanner 8 | 6510-EX-1-FF | Entry |