Panel Information
| Barcode | 6510-EX-1-FF-2 |
| Panel Number | EX-1-FF |
| Site | Cefn Cribwr_BL_PL7-10_FF_EX (#6510) |
| Plot | 7-10 |
| Position | EX |
| Floor | FF |
| Block | — |
| Length | 2580 mm |
| CDT File | Z:\6510_Cefn Cribwr_BL_PL7-10_FF_EX\6510_Cefn Cribwr_BL_PL7-10_FF_EX---140-2620\FRAMEEX-1-FF.CDT |
| Status | Complete |
| Created | 13/10/2026 07:17:37 |
| Completed | 14/10/2026 14:45:07 |
Station Timeline
Framing Station
Printed: 07:17:37
Insulation Boarding
Arrived: 07:48:18
· Left: 09:13:47
· 5129s
Nailing Bridge
Arrived: 09:13:47
· Left: 10:37:55
· 5048s
Paper Application
Arrived: 10:37:55
· Left: 13:44:19
· 11183s
Panel Flipping
Not yet reached
Insulation Filling
Arrived: 13:44:19
· Left: 14:45:07
· 90048s
OSB Glue Application
Not yet reached
Paper Application 2
Not yet reached
Exit Line to Windows
Not yet reached
All Scan Events
4 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 07:48:18 | Insulation Boarding | Scanner 1 | 6510-EX-1-FF-2 | Entry |
| 09:13:47 | Nailing Bridge | Scanner 2 | 6510-EX-1-FF-2 | Entry |
| 10:37:55 | Paper Application | Scanner 3 | 6510-EX-1-FF-2 | Entry |
| 13:44:19 | Insulation Filling | Scanner 5 | 6510-EX-1-FF-2 | Entry |