Panel Information
| Barcode | 6517-EX-3-GF-15 |
| Panel Number | EX-3-GF |
| Site | New Mill_BL_PL46-47_GF_EX (#6517) |
| Plot | 46-47 |
| Position | EX |
| Floor | GF |
| Block | — |
| Length | 4199 mm |
| CDT File | Z:\6517_New Mill_BL_PL46-47_GF_EX\6517_New Mill_BL_PL46-47_GF_EX---219-2459\FRAMEEX-3-GF.CDT |
| Status | Complete |
| Created | 14/10/2026 11:18:03 |
| Completed | 15/10/2026 15:19:08 |
Station Timeline
Framing Station
Printed: 11:18:03
Insulation Boarding
Not yet reached
Nailing Bridge
Arrived: 15:35:46
· Left: 06:58:39
· 55372s
Paper Application
Arrived: 06:58:39
· Left: 15:19:08
· 30029s
Panel Flipping
Not yet reached
Insulation Filling
Not yet reached
OSB Glue Application
Not yet reached
Paper Application 2
Not yet reached
Exit Line to Windows
Arrived: 15:32:54
· Currently here
All Scan Events
3 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 15:35:46 | Nailing Bridge | Scanner 2 | 6517-EX-3-GF-15 | Entry |
| 06:58:39 | Paper Application | Scanner 3 | 6517-EX-3-GF-15 | Entry |
| 15:32:54 | Exit Line to Windows | Scanner 8 | 6517-EX-3-GF-15 | Entry |