Panel Information
| Barcode | 6517-EX-3-GF-16 |
| Panel Number | EX-3-GF |
| Site | New Mill_BL_PL1-2_GF_EX (#6517) |
| Plot | 1-2 |
| Position | EX |
| Floor | GF |
| Block | — |
| Length | 3131 mm |
| CDT File | Z:\6517_New Mill_BL_PL1-2_GF_EX\6517_New Mill_BL_PL1-2_GF_EX---219-2459\FRAMEEX-3-GF.CDT |
| Status | Complete |
| Created | 19/10/2026 12:47:44 |
| Completed | 21/10/2026 07:48:54 |
Station Timeline
Framing Station
Printed: 12:47:44
Insulation Boarding
Not yet reached
Nailing Bridge
Arrived: 15:01:13
· Left: 15:29:28
· 1694s
Paper Application
Arrived: 15:29:28
· Left: 07:48:54
· 145166s
Panel Flipping
Not yet reached
Insulation Filling
Not yet reached
OSB Glue Application
Not yet reached
Paper Application 2
Not yet reached
Exit Line to Windows
Not yet reached
All Scan Events
2 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 15:01:13 | Nailing Bridge | Scanner 2 | 6517-EX-3-GF-16 | Entry |
| 15:29:28 | Paper Application | Scanner 3 | 6517-EX-3-GF-16 | Entry |