Panel Information
| Barcode | 6517-EX-5-FF-15 |
| Panel Number | EX-5-FF |
| Site | New Mill_BL_PL1-2_FF_EX (#6517) |
| Plot | 1-2 |
| Position | EX |
| Floor | FF |
| Block | — |
| Length | 2602 mm |
| CDT File | Z:\6517_New Mill_BL_PL1-2_FF_EX\6517_New Mill_BL_PL1-2_FF_EX---219-2472\FRAMEEX-5-FF.CDT |
| Status | Complete |
| Created | 21/10/2026 10:30:47 |
| Completed | 22/10/2026 10:15:19 |
Station Timeline
Framing Station
Printed: 10:30:47
Insulation Boarding
Not yet reached
Nailing Bridge
Arrived: 12:11:30
· Left: 12:49:57
· 2306s
Paper Application
Arrived: 12:49:57
· Left: 15:37:49
· 10071s
Panel Flipping
Not yet reached
Insulation Filling
Not yet reached
OSB Glue Application
Not yet reached
Paper Application 2
Arrived: 15:37:49
· Left: 10:15:19
· 67050s
Exit Line to Windows
Not yet reached
All Scan Events
3 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 12:11:30 | Nailing Bridge | Scanner 2 | 6517-EX-5-FF-15 | Entry |
| 12:49:57 | Paper Application | Scanner 3 | 6517-EX-5-FF-15 | Entry |
| 15:37:49 | Paper Application 2 | Scanner 7 | 6517-EX-5-FF-15 | Entry |