Panel Information
| Barcode | 6221-PY-81-TF |
| Panel Number | PY-81-TF |
| Site | Charles St (#6221) |
| Plot | — |
| Position | PY |
| Floor | 3rdF |
| Block | — |
| Length | 2399 mm |
| CDT File | Z:\6221_Charles St_-3rdF-3rdF PY\6221_Charles St_-3rdF-89-2787\FRAMEPY-81-TF.CDT |
| Status | Complete |
| Created | 03/07/2026 14:22:45 |
| Completed | 06/07/2026 07:57:52 |
Station Timeline
Framing Station
Printed: 14:22:45
Insulation Boarding
Arrived: 14:52:44
· Left: 15:00:27
· 462s
Nailing Bridge
Arrived: 15:00:27
· Left: 06:05:58
· 54331s
Paper Application
Arrived: 06:05:58
· Left: 06:10:27
· 268s
Panel Flipping
Arrived: 06:10:27
· Left: 07:57:52
· 179244s
Insulation Filling
Not yet reached
OSB Glue Application
Not yet reached
Paper Application 2
Not yet reached
Exit Line to Windows
Not yet reached
All Scan Events
4 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 14:52:44 | Insulation Boarding | Scanner 1 | 6221-PY-81-TF | Entry |
| 15:00:27 | Nailing Bridge | Scanner 2 | 6221-PY-81-TF | Entry |
| 06:05:58 | Paper Application | Scanner 3 | 6221-PY-81-TF | Entry |
| 06:10:27 | Panel Flipping | Scanner 4 | 6221-PY-81-TF | Entry |