Panel Information
| Barcode | 6221-PY-82-TF |
| Panel Number | PY-82-TF |
| Site | Charles St (#6221) |
| Plot | — |
| Position | PY |
| Floor | 3rdF |
| Block | — |
| Length | 1016 mm |
| CDT File | Z:\6221_Charles St_-3rdF-3rdF PY\6221_Charles St_-3rdF-89-2787\FRAMEPY-82-TF.CDT |
| Status | Complete |
| Created | 03/07/2026 14:26:41 |
| Completed | 06/07/2026 07:57:55 |
Station Timeline
Framing Station
Printed: 14:26:41
Insulation Boarding
Not yet reached
Nailing Bridge
Arrived: 15:00:36
· Left: 06:09:34
· 54537s
Paper Application
Arrived: 06:09:34
· Left: 06:10:31
· 57s
Panel Flipping
Arrived: 06:10:31
· Left: 07:57:55
· 179244s
Insulation Filling
Not yet reached
OSB Glue Application
Not yet reached
Paper Application 2
Not yet reached
Exit Line to Windows
Not yet reached
All Scan Events
3 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 15:00:36 | Nailing Bridge | Scanner 2 | 6221-PY-82-TF | Entry |
| 06:09:34 | Paper Application | Scanner 3 | 6221-PY-82-TF | Entry |
| 06:10:31 | Panel Flipping | Scanner 4 | 6221-PY-82-TF | Entry |