Panel Information
| Barcode | 6517-EX-8-FF-2 |
| Panel Number | EX-8-FF |
| Site | New Mill_BL_PL36-37_FF_EX (#6517) |
| Plot | 36-37 |
| Position | EX |
| Floor | FF |
| Block | — |
| Length | 2623 mm |
| CDT File | \\L2555-EC1-SRV\Projects\6517_New Mill_BL_PL36-37_FF_EX\6517_New Mill_BL_PL36-37_FF_EX---219-2472\FRAMEEX-8-FF.CDT |
| Status | Complete |
| Created | 07/07/2026 13:17:09 |
| Completed | 08/07/2026 07:24:24 |
Station Timeline
Framing Station
Printed: 13:17:09
Insulation Boarding
Arrived: 13:19:49
· Left: 13:20:48
· 58s
Nailing Bridge
Arrived: 13:20:48
· Left: 13:52:47
· 1918s
Paper Application
Arrived: 13:52:47
· Left: 13:53:16
· 29s
Panel Flipping
Arrived: 13:53:16
· Left: 14:11:54
· 1118s
Insulation Filling
Not yet reached
OSB Glue Application
Not yet reached
Paper Application 2
Arrived: 14:11:54
· Left: 07:24:24
· 61949s
Exit Line to Windows
Not yet reached
All Scan Events
5 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 13:19:49 | Insulation Boarding | Scanner 1 | 6517-EX-8-FF-2 | Entry |
| 13:20:48 | Nailing Bridge | Scanner 2 | 6517-EX-8-FF-2 | Entry |
| 13:52:47 | Paper Application | Scanner 3 | 6517-EX-8-FF-2 | Entry |
| 13:53:16 | Panel Flipping | Scanner 4 | 6517-EX-8-FF-2 | Entry |
| 14:11:54 | Paper Application 2 | Scanner 7 | 6517-EX-8-FF-2 | Entry |