Panel Information
| Barcode | 6517-EX-7-FF-2 |
| Panel Number | EX-7-FF |
| Site | New Mill_BL_PL36-37_FF_EX (#6517) |
| Plot | 36-37 |
| Position | EX |
| Floor | FF |
| Block | — |
| Length | 2623 mm |
| CDT File | \\L2555-EC1-SRV\Projects\6517_New Mill_BL_PL36-37_FF_EX\6517_New Mill_BL_PL36-37_FF_EX---219-2472\FRAMEEX-7-FF.CDT |
| Status | Complete |
| Created | 07/07/2026 13:18:08 |
| Completed | 08/07/2026 07:24:27 |
Station Timeline
Framing Station
Printed: 13:18:08
Insulation Boarding
Arrived: 13:19:45
· Left: 13:20:48
· 62s
Nailing Bridge
Arrived: 13:20:48
· Left: 13:22:04
· 76s
Paper Application
Arrived: 13:22:04
· Left: 13:23:03
· 58s
Panel Flipping
Arrived: 13:23:03
· Left: 07:24:27
· 64884s
Insulation Filling
Not yet reached
OSB Glue Application
Not yet reached
Paper Application 2
Not yet reached
Exit Line to Windows
Not yet reached
All Scan Events
4 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 13:19:45 | Insulation Boarding | Scanner 1 | 6517-EX-7-FF-2 | Entry |
| 13:20:48 | Nailing Bridge | Scanner 2 | 6517-EX-7-FF-2 | Entry |
| 13:22:04 | Paper Application | Scanner 3 | 6517-EX-7-FF-2 | Entry |
| 13:23:03 | Panel Flipping | Scanner 4 | 6517-EX-7-FF-2 | Entry |