Panel Information
| Barcode | 6517-EX-6-FF |
| Panel Number | EX-6-FF |
| Site | New Mill_BL_PL38-39_FF_EX (#6517) |
| Plot | 38-39 |
| Position | EX |
| Floor | FF |
| Block | — |
| Length | 2972 mm |
| CDT File | Z:\6517_New Mill_BL_PL38-39_FF_EX\6517_New Mill_BL_PL38-39_FF_EX---219-2472\FRAMEEX-6-FF.CDT |
| Status | Complete |
| Created | 29/06/2026 08:21:58 |
| Completed | 29/06/2026 13:02:53 |
Station Timeline
Framing Station
Printed: 08:21:58
Insulation Boarding
Not yet reached
Nailing Bridge
Arrived: 13:00:51
· Left: 13:01:35
· 43s
Paper Application
Not yet reached
Panel Flipping
Not yet reached
Insulation Filling
Not yet reached
OSB Glue Application
Not yet reached
Paper Application 2
Not yet reached
Exit Line to Windows
Not yet reached
All Scan Events
7 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 13:00:51 | Nailing Bridge | Scanner 2 | 6517-EX-6-FF | Entry |
| 13:01:35 | Paper | Scanner 3 | 6517-EX-6-FF | Entry |
| 13:01:44 | Station 5 | Scanner 4 | 6517-EX-6-FF | Entry |
| 13:02:12 | Station 6 | Scanner 5 | 6517-EX-6-FF | Entry |
| 13:02:24 | Station 7 | Scanner 6 | 6517-EX-6-FF | Entry |
| 13:02:37 | Station 8 | Scanner 7 | 6517-EX-6-FF | Entry |
| 13:02:53 | Station 9 | Scanner 8 | 6517-EX-6-FF | Entry |