Panel Information
| Barcode | 6517-EX-7-FF |
| Panel Number | EX-7-FF |
| Site | New Mill_BL_PL38-39_FF_EX (#6517) |
| Plot | 38-39 |
| Position | EX |
| Floor | FF |
| Block | — |
| Length | 2623 mm |
| CDT File | Z:\6517_New Mill_BL_PL38-39_FF_EX\6517_New Mill_BL_PL38-39_FF_EX---219-2472\FRAMEEX-7-FF.CDT |
| Status | Complete |
| Created | 29/06/2026 09:17:02 |
| Completed | 30/06/2026 08:34:13 |
Station Timeline
Framing Station
Printed: 09:17:02
Insulation Boarding
Arrived: 13:03:41
· Left: 13:03:56
· 15s
Nailing Bridge
Arrived: 13:03:56
· Left: 14:07:16
· 3799s
Paper Application
Not yet reached
Panel Flipping
Not yet reached
Insulation Filling
Arrived: 15:44:48
· Left: 15:45:10
· 21s
OSB Glue Application
Arrived: 15:45:10
· Left: 15:45:34
· 23s
Paper Application 2
Arrived: 15:45:34
· Left: 08:34:13
· 60519s
Exit Line to Windows
Arrived: 08:34:13
· Left: 08:34:13
All Scan Events
9 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 13:03:41 | Insulation Boarding | Scanner 1 | 6517-EX-7-FF | Entry |
| 13:03:56 | Nailing Bridge | Scanner 2 | 6517-EX-7-FF | Entry |
| 14:07:16 | Paper | Scanner 3 | 6517-EX-7-FF | Entry |
| 14:07:45 | Station 5 | Scanner 4 | 6517-EX-7-FF | Entry |
| 15:44:48 | Insulation Filling | Scanner 5 | 6517-EX-7-FF | Entry |
| 15:45:10 | OSB Glue Application | Scanner 6 | 6517-EX-7-FF | Entry |
| 15:45:34 | Paper Application 2 | Scanner 7 | 6517-EX-7-FF | Entry |
| 08:34:13 | Exit Line to Windows | Scanner 8 | 6517-EX-7-FF | Entry |
| 08:34:23 | Exit Line to Windows | Scanner 8 | 6517-EX-7-FF | Entry |