Panel Information
| Barcode | 6517-EX-9-FF |
| Panel Number | EX-9-FF |
| Site | New Mill_BL_PL38-39_FF_EX (#6517) |
| Plot | 38-39 |
| Position | EX |
| Floor | FF |
| Block | — |
| Length | 2972 mm |
| CDT File | Z:\6517_New Mill_BL_PL38-39_FF_EX\6517_New Mill_BL_PL38-39_FF_EX---219-2472\FRAMEEX-9-FF.CDT |
| Status | Complete |
| Created | 29/06/2026 11:24:37 |
| Completed | 30/06/2026 10:25:50 |
Station Timeline
Framing Station
Printed: 11:24:37
Insulation Boarding
Arrived: 13:42:56
· Left: 14:22:10
· 2353s
Nailing Bridge
Arrived: 14:22:10
· Left: 14:34:46
· 756s
Paper Application
Arrived: 14:34:46
· Left: 14:36:11
· 84s
Panel Flipping
Arrived: 14:36:11
· Left: 15:44:51
· 4120s
Insulation Filling
Arrived: 15:44:51
· Left: 15:45:14
· 23s
OSB Glue Application
Arrived: 15:45:14
· Left: 15:45:37
· 22s
Paper Application 2
Arrived: 15:45:37
· Left: 10:25:50
· 67212s
Exit Line to Windows
Arrived: 10:25:50
· Left: 10:25:50
All Scan Events
8 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 13:42:56 | Insulation Boarding | Scanner 1 | 6517-EX-9-FF | Entry |
| 14:22:10 | Nailing Bridge | Scanner 2 | 6517-EX-9-FF | Entry |
| 14:34:46 | Paper Application | Scanner 3 | 6517-EX-9-FF | Entry |
| 14:36:11 | Panel Flipping | Scanner 4 | 6517-EX-9-FF | Entry |
| 15:44:51 | Insulation Filling | Scanner 5 | 6517-EX-9-FF | Entry |
| 15:45:14 | OSB Glue Application | Scanner 6 | 6517-EX-9-FF | Entry |
| 15:45:37 | Paper Application 2 | Scanner 7 | 6517-EX-9-FF | Entry |
| 10:25:50 | Exit Line to Windows | Scanner 8 | 6517-EX-9-FF | Entry |