Factory Overview
Read Only

Panel Detail

Back to Panels
Panel Information
Barcode FRAMEEX-3-FF
Panel Number EX-3-FF
Site New Mill_BL_PL34-35_FF_EX (#6517)
Plot 34-35
Position EX
Floor FF
Block
Length 2393 mm
CDT File Z:\6517_New Mill_BL_PL34-35_FF_EX\6517_New Mill_BL_PL34-35_FF_EX---219-2472\FRAMEEX-3-FF.CDT
Status Complete
Created 16/07/2026 12:03:07
Completed 17/07/2026 10:09:22
Station Timeline
Framing Station
Printed: 13:26:21
Insulation Boarding
Arrived: 13:36:24  ·  Left: 14:55:33  ·  4748s
Nailing Bridge
Arrived: 14:55:33  ·  Left: 14:59:55  ·  262s
Paper Application
Arrived: 14:59:55  ·  Left: 15:24:47  ·  1491s
Panel Flipping
Arrived: 15:24:47  ·  Left: 10:09:22  ·  67474s
Insulation Filling
Not yet reached
OSB Glue Application
Not yet reached
Paper Application 2
Not yet reached
Exit Line to Windows
Not yet reached
All Scan Events 4 total
Time Station Scanner Barcode Type
13:36:24 Insulation Boarding Scanner 1 FRAMEEX-3-FF Entry
14:55:33 Nailing Bridge Scanner 2 FRAMEEX-3-FF Entry
14:59:55 Paper Application Scanner 3 FRAMEEX-3-FF Entry
15:24:47 Panel Flipping Scanner 4 FRAMEEX-3-FF Entry