Panel Information
| Barcode | 6517-PY-2-FF |
| Panel Number | PY-2-FF |
| Site | New Mill_BL_PL38-39_FF_PY (#6517) |
| Plot | 38-39 |
| Position | PY |
| Floor | FF |
| Block | — |
| Length | 2998 mm |
| CDT File | Z:\6517_New Mill_BL_PL38-39_FF_PY\6517_New Mill_BL_PL38-39_FF_PY---89-2477\FRAMEPY-2-FF.CDT |
| Status | Complete |
| Created | 30/06/2026 06:58:15 |
| Completed | 30/06/2026 14:03:48 |
Station Timeline
Framing Station
Printed: 06:58:15
Insulation Boarding
Arrived: 07:45:44
· Left: 08:14:16
· 1711s
Nailing Bridge
Arrived: 08:14:16
· Left: 09:16:37
· 3741s
Paper Application
Arrived: 09:16:37
· Left: 09:18:22
· 104s
Panel Flipping
Arrived: 09:18:22
· Left: 09:43:26
· 1503s
Insulation Filling
Arrived: 09:43:26
· Left: 10:55:56
· 4350s
OSB Glue Application
Not yet reached
Paper Application 2
Arrived: 10:55:56
· Left: 14:03:48
· 11271s
Exit Line to Windows
Not yet reached
All Scan Events
6 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 07:45:44 | Insulation Boarding | Scanner 1 | 6517-PY-2-FF | Entry |
| 08:14:16 | Nailing Bridge | Scanner 2 | 6517-PY-2-FF | Entry |
| 09:16:37 | Paper Application | Scanner 3 | 6517-PY-2-FF | Entry |
| 09:18:22 | Panel Flipping | Scanner 4 | 6517-PY-2-FF | Entry |
| 09:43:26 | Insulation Filling | Scanner 5 | 6517-PY-2-FF | Entry |
| 10:55:56 | Paper Application 2 | Scanner 7 | 6517-PY-2-FF | Entry |