Panel Information
| Barcode | 6517-PY-1-FF |
| Panel Number | PY-1-FF |
| Site | New Mill_BL_PL38-39_FF_PY (#6517) |
| Plot | 38-39 |
| Position | PY |
| Floor | FF |
| Block | — |
| Length | 2438 mm |
| CDT File | Z:\6517_New Mill_BL_PL38-39_FF_PY\6517_New Mill_BL_PL38-39_FF_PY---89-2477\FRAMEPY-1-FF.CDT |
| Status | Complete |
| Created | 30/06/2026 07:45:41 |
| Completed | 30/06/2026 14:03:56 |
Station Timeline
Framing Station
Printed: 07:45:41
Insulation Boarding
Not yet reached
Nailing Bridge
Arrived: 08:14:21
· Left: 09:17:56
· 3814s
Paper Application
Arrived: 09:17:56
· Left: 09:19:25
· 88s
Panel Flipping
Arrived: 09:19:25
· Left: 09:43:21
· 1436s
Insulation Filling
Arrived: 09:43:21
· Left: 09:43:48
· 27s
OSB Glue Application
Arrived: 09:43:48
· Left: 11:36:04
· 6735s
Paper Application 2
Arrived: 11:36:04
· Left: 14:03:56
· 8871s
Exit Line to Windows
Not yet reached
All Scan Events
6 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 08:14:21 | Nailing Bridge | Scanner 2 | 6517-PY-1-FF | Entry |
| 09:17:56 | Paper Application | Scanner 3 | 6517-PY-1-FF | Entry |
| 09:19:25 | Panel Flipping | Scanner 4 | 6517-PY-1-FF | Entry |
| 09:43:21 | Insulation Filling | Scanner 5 | 6517-PY-1-FF | Entry |
| 09:43:48 | OSB Glue Application | Scanner 6 | 6517-PY-1-FF | Entry |
| 11:36:04 | Paper Application 2 | Scanner 7 | 6517-PY-1-FF | Entry |