Panel Information
| Barcode | 6493 ST DAVIDS-EX-GF-22 |
| Panel Number | EX-GF-22 |
| Site | ST DAVIDS (#6493 ST DAVIDS) |
| Plot | — |
| Position | EX |
| Floor | GF |
| Block | — |
| Length | 4799 mm |
| CDT File | Z:\6493 ST DAVIDS-PLOT 3-GF EX\6493 ST DAVIDS-PLOT 3-140-3075\FRAMEEX-GF-22.CDT |
| Status | Complete |
| Created | 20/07/2026 14:55:52 |
| Completed | 21/07/2026 09:13:23 |
Station Timeline
Framing Station
Printed: 14:55:52
Insulation Boarding
Arrived: 17:48:55
· Left: 17:49:06
· 10s
Nailing Bridge
Arrived: 17:49:06
· Left: 17:49:21
· 15s
Paper Application
Arrived: 17:49:21
· Left: 17:49:40
· 19s
Panel Flipping
Arrived: 17:49:40
· Left: 08:12:38
· 51777s
Insulation Filling
Not yet reached
OSB Glue Application
Not yet reached
Paper Application 2
Not yet reached
Exit Line to Windows
Not yet reached
All Scan Events
6 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 17:48:55 | Insulation Boarding | Scanner 1 | 6493 ST DAVIDS-EX-GF-22 | Entry |
| 17:49:06 | Nailing Bridge | Scanner 2 | 6493 ST DAVIDS-EX-GF-22 | Entry |
| 17:49:21 | Paper Application | Scanner 3 | 6493 ST DAVIDS-EX-GF-22 | Entry |
| 17:49:40 | Panel Flipping | Scanner 4 | 6493 ST DAVIDS-EX-GF-22 | Entry |
| 08:12:38 | Nailing Bridge | Scanner 2 | 6493 ST DAVIDS-EX-GF-22 | Entry |
| 08:31:21 | Paper Application | Scanner 3 | 6493 ST DAVIDS-EX-GF-22 | Entry |