Panel Information
| Barcode | 6517-EX-3-FF-2 |
| Panel Number | EX-3-FF |
| Site | New Mill_BL_PL32-33_FF_EX (#6517) |
| Plot | 32-33 |
| Position | EX |
| Floor | FF |
| Block | — |
| Length | 2393 mm |
| CDT File | Z:\6517_New Mill_BL_PL32-33_FF_EX\6517_New Mill_BL_PL32-33_FF_EX---219-2472\FRAMEEX-3-FF.CDT |
| Status | Complete |
| Created | 22/07/2026 14:51:51 |
| Completed | 23/07/2026 12:14:21 |
Station Timeline
Framing Station
Printed: 14:51:51
Insulation Boarding
Arrived: 16:08:52
· Left: 07:05:29
· 53796s
Nailing Bridge
Arrived: 07:05:29
· Left: 07:21:49
· 979s
Paper Application
Arrived: 07:21:49
· Left: 12:14:21
· 17551s
Panel Flipping
Not yet reached
Insulation Filling
Not yet reached
OSB Glue Application
Not yet reached
Paper Application 2
Not yet reached
Exit Line to Windows
Not yet reached
All Scan Events
3 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 16:08:52 | Insulation Boarding | Scanner 1 | 6517-EX-3-FF-2 | Entry |
| 07:05:29 | Nailing Bridge | Scanner 2 | 6517-EX-3-FF-2 | Entry |
| 07:21:49 | Paper Application | Scanner 3 | 6517-EX-3-FF-2 | Entry |