Panel Information
| Barcode | 6517-EX-2-FF |
| Panel Number | EX-2-FF |
| Site | New Mill_BL_PL32-33_FF_EX (#6517) |
| Plot | 32-33 |
| Position | EX |
| Floor | FF |
| Block | — |
| Length | 2930 mm |
| CDT File | Z:\6517_New Mill_BL_PL32-33_FF_EX\6517_New Mill_BL_PL32-33_FF_EX---219-2472\FRAMEEX-2-FF.CDT |
| Status | Complete |
| Created | 23/07/2026 07:02:14 |
| Completed | 23/07/2026 12:14:21 |
Station Timeline
Framing Station
Printed: 07:02:14
Insulation Boarding
Arrived: 08:20:53
· Left: 09:15:54
· 3301s
Nailing Bridge
Arrived: 09:15:54
· Left: 09:21:07
· 312s
Paper Application
Arrived: 09:21:07
· Left: 12:14:21
· 10393s
Panel Flipping
Not yet reached
Insulation Filling
Not yet reached
OSB Glue Application
Not yet reached
Paper Application 2
Not yet reached
Exit Line to Windows
Not yet reached
All Scan Events
3 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 08:20:53 | Insulation Boarding | Scanner 1 | 6517-EX-2-FF | Entry |
| 09:15:54 | Nailing Bridge | Scanner 2 | 6517-EX-2-FF | Entry |
| 09:21:07 | Paper Application | Scanner 3 | 6517-EX-2-FF | Entry |