Panel Information
| Barcode | 6517-EX-1-FF-3 |
| Panel Number | EX-1-FF |
| Site | New Mill_BL_PL32-33_FF_EX (#6517) |
| Plot | 32-33 |
| Position | EX |
| Floor | FF |
| Block | — |
| Length | 2665 mm |
| CDT File | Z:\6517_New Mill_BL_PL32-33_FF_EX\6517_New Mill_BL_PL32-33_FF_EX---219-2472\FRAMEEX-1-FF.CDT |
| Status | Complete |
| Created | 23/07/2026 07:32:19 |
| Completed | 23/07/2026 10:59:40 |
Station Timeline
Framing Station
Printed: 07:32:19
Insulation Boarding
Arrived: 09:16:21
· Left: 09:49:54
· 2013s
Nailing Bridge
Arrived: 09:49:54
· Left: 09:53:35
· 220s
Paper Application
Arrived: 09:53:35
· Left: 10:59:40
· 3965s
Panel Flipping
Not yet reached
Insulation Filling
Not yet reached
OSB Glue Application
Not yet reached
Paper Application 2
Not yet reached
Exit Line to Windows
Arrived: 10:59:40
· Left: 10:59:40
All Scan Events
5 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 09:16:21 | Insulation Boarding | Scanner 1 | 6517-EX-1-FF-3 | Entry |
| 09:49:54 | Nailing Bridge | Scanner 2 | 6517-EX-1-FF-3 | Entry |
| 09:53:35 | Paper Application | Scanner 3 | 6517-EX-1-FF-3 | Entry |
| 10:59:40 | Exit Line to Windows | Scanner 8 | 6517-EX-1-FF-3 | Entry |
| 11:06:33 | Exit Line to Windows | Scanner 8 | 6517-EX-1-FF-3 | Entry |