Panel Information
| Barcode | 6493 ST DAVIDS-EX-FF-25 |
| Panel Number | EX-FF-25 |
| Site | ST DAVIDS (#6493 ST DAVIDS) |
| Plot | 3 |
| Position | EX |
| Floor | FF |
| Block | — |
| Length | 4021 mm |
| CDT File | Z:\6493 ST DAVIDS-PLOT 3-FF EX\6493 ST DAVIDS-PLOT 3-140-2663\FRAMEEX-FF-25.CDT |
| Status | Complete |
| Created | 24/07/2026 07:32:39 |
| Completed | 24/07/2026 13:57:31 |
Station Timeline
Framing Station
Printed: 07:32:39
Insulation Boarding
Not yet reached
Nailing Bridge
Arrived: 08:12:17
· Left: 08:17:31
· 313s
Paper Application
Arrived: 08:17:31
· Left: 09:19:12
· 3701s
Panel Flipping
Not yet reached
Insulation Filling
Not yet reached
OSB Glue Application
Not yet reached
Paper Application 2
Arrived: 09:19:12
· Left: 13:57:31
· 16698s
Exit Line to Windows
Not yet reached
All Scan Events
3 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 08:12:17 | Nailing Bridge | Scanner 2 | 6493 ST DAVIDS-EX-FF-25 | Entry |
| 08:17:31 | Paper Application | Scanner 3 | 6493 ST DAVIDS-EX-FF-25 | Entry |
| 09:19:12 | Paper Application 2 | Scanner 7 | 6493 ST DAVIDS-EX-FF-25 | Entry |