Panel Information
| Barcode | 6517-EX-2-FF-2 |
| Panel Number | EX-2-FF |
| Site | New Mill_BL_PL19_FF_EX (#6517) |
| Plot | 19 |
| Position | EX |
| Floor | FF |
| Block | — |
| Length | 3409 mm |
| CDT File | Z:\6517_New Mill_BL_PL19_FF_EX\6517_New Mill_BL_PL19_FF_EX---219-2472\FRAMEEX-2-FF.CDT |
| Status | Complete |
| Created | 27/07/2026 15:31:23 |
| Completed | 28/07/2026 12:00:43 |
Station Timeline
Framing Station
Printed: 15:31:23
Insulation Boarding
Not yet reached
Nailing Bridge
Arrived: 08:34:37
· Left: 08:47:51
· 793s
Paper Application
Arrived: 08:47:51
· Left: 09:41:03
· 3191s
Panel Flipping
Not yet reached
Insulation Filling
Not yet reached
OSB Glue Application
Arrived: 09:41:03
· Left: 12:00:43
· 8379s
Paper Application 2
Not yet reached
Exit Line to Windows
Not yet reached
All Scan Events
3 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 08:34:37 | Nailing Bridge | Scanner 2 | 6517-EX-2-FF-2 | Entry |
| 08:47:51 | Paper Application | Scanner 3 | 6517-EX-2-FF-2 | Entry |
| 09:41:03 | OSB Glue Application | Scanner 6 | 6517-EX-2-FF-2 | Entry |