Panel Information
| Barcode | 6517-EX-8-GF-5 |
| Panel Number | EX-8-GF |
| Site | New Mill_BL_PL20-21_GF_EX (#6517) |
| Plot | 20-21 |
| Position | EX |
| Floor | GF |
| Block | — |
| Length | 2809 mm |
| CDT File | Z:\6517_New Mill_BL_PL20-21_GF_EX\6517_New Mill_BL_PL20-21_GF_EX---219-2459\FRAMEEX-8-GF.CDT |
| Status | Complete |
| Created | 28/07/2026 14:22:17 |
| Completed | 29/07/2026 09:41:41 |
Station Timeline
Framing Station
Printed: 14:22:17
Insulation Boarding
Not yet reached
Nailing Bridge
Arrived: 16:01:44
· Left: 16:06:03
· 258s
Paper Application
Arrived: 16:06:03
· Left: 07:22:50
· 55007s
Panel Flipping
Not yet reached
Insulation Filling
Not yet reached
OSB Glue Application
Not yet reached
Paper Application 2
Arrived: 07:22:50
· Left: 09:41:41
· 8330s
Exit Line to Windows
Arrived: 09:41:41
· Left: 09:41:41
All Scan Events
4 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 16:01:44 | Nailing Bridge | Scanner 2 | 6517-EX-8-GF-5 | Entry |
| 16:06:03 | Paper Application | Scanner 3 | 6517-EX-8-GF-5 | Entry |
| 07:22:50 | Paper Application 2 | Scanner 7 | 6517-EX-8-GF-5 | Entry |
| 09:41:41 | Exit Line to Windows | Scanner 8 | 6517-EX-8-GF-5 | Entry |