Panel Information
| Barcode | 6517-EX-10-GF-3 |
| Panel Number | EX-10-GF |
| Site | New Mill_BL_PL20-21_GF_EX (#6517) |
| Plot | 20-21 |
| Position | EX |
| Floor | GF |
| Block | — |
| Length | 4489 mm |
| CDT File | Z:\6517_New Mill_BL_PL20-21_GF_EX\6517_New Mill_BL_PL20-21_GF_EX---219-2459\FRAMEEX-10-GF.CDT |
| Status | Complete |
| Created | 29/07/2026 11:49:21 |
| Completed | 30/07/2026 08:34:48 |
Station Timeline
Framing Station
Printed: 11:49:21
Insulation Boarding
Not yet reached
Nailing Bridge
Arrived: 15:06:19
· Left: 15:13:55
· 455s
Paper Application
Arrived: 15:13:55
· Left: 15:47:43
· 2028s
Panel Flipping
Not yet reached
Insulation Filling
Not yet reached
OSB Glue Application
Not yet reached
Paper Application 2
Arrived: 15:47:43
· Left: 08:34:48
· 60424s
Exit Line to Windows
Not yet reached
All Scan Events
3 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 15:06:19 | Nailing Bridge | Scanner 2 | 6517-EX-10-GF-3 | Entry |
| 15:13:55 | Paper Application | Scanner 3 | 6517-EX-10-GF-3 | Entry |
| 15:47:43 | Paper Application 2 | Scanner 7 | 6517-EX-10-GF-3 | Entry |