Panel Information
| Barcode | 6517-EX-8-FF-6 |
| Panel Number | EX-8-FF |
| Site | New Mill_BL_PL20-21_FF_EX (#6517) |
| Plot | 20-21 |
| Position | EX |
| Floor | FF |
| Block | — |
| Length | 2809 mm |
| CDT File | Z:\6517_New Mill_BL_PL20-21_FF_EX\6517_New Mill_BL_PL20-21_FF_EX---219-2472\FRAMEEX-8-FF.CDT |
| Status | Complete |
| Created | 29/07/2026 16:16:48 |
| Completed | 30/07/2026 12:31:25 |
Station Timeline
Framing Station
Printed: 16:16:48
Insulation Boarding
Not yet reached
Nailing Bridge
Arrived: 09:34:36
· Left: 09:37:45
· 188s
Paper Application
Arrived: 09:37:45
· Left: 12:31:25
· 10420s
Panel Flipping
Not yet reached
Insulation Filling
Not yet reached
OSB Glue Application
Not yet reached
Paper Application 2
Not yet reached
Exit Line to Windows
Arrived: 12:31:25
· Left: 12:31:25
All Scan Events
3 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 09:34:36 | Nailing Bridge | Scanner 2 | 6517-EX-8-FF-6 | Entry |
| 09:37:45 | Paper Application | Scanner 3 | 6517-EX-8-FF-6 | Entry |
| 12:31:25 | Exit Line to Windows | Scanner 8 | 6517-EX-8-FF-6 | Entry |