Panel Information
| Barcode | 6221-EX-6-TF |
| Panel Number | EX-6-TF |
| Site | Charles St (#6221) |
| Plot | — |
| Position | EX |
| Floor | 3rdF |
| Block | — |
| Length | 3599 mm |
| CDT File | Z:\6221_Charles St_-3rdF-3rdF EX\6221_Charles St_-3rdF-140-2787\FRAMEEX-6-TF.CDT |
| Status | Complete |
| Created | 30/06/2026 12:14:34 |
| Completed | 01/07/2026 12:32:47 |
Station Timeline
Framing Station
Printed: 12:14:34
Insulation Boarding
Arrived: 12:23:58
· Left: 13:41:57
· 4678s
Nailing Bridge
Arrived: 13:41:57
· Left: 14:14:03
· 1925s
Paper Application
Arrived: 14:14:03
· Left: 14:14:33
· 30s
Panel Flipping
Arrived: 14:14:33
· Left: 12:32:47
· 80293s
Insulation Filling
Not yet reached
OSB Glue Application
Not yet reached
Paper Application 2
Not yet reached
Exit Line to Windows
Arrived: 12:32:47
· Left: 12:32:47
All Scan Events
5 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 12:23:58 | Insulation Boarding | Scanner 1 | 6221-EX-6-TF | Entry |
| 13:41:57 | Nailing Bridge | Scanner 2 | 6221-EX-6-TF | Entry |
| 14:14:03 | Paper Application | Scanner 3 | 6221-EX-6-TF | Entry |
| 14:14:33 | Panel Flipping | Scanner 4 | 6221-EX-6-TF | Entry |
| 12:32:47 | Exit Line to Windows | Scanner 8 | 6221-EX-6-TF | Entry |