Panel Information
| Barcode | 6517-PY-3-FF-5 |
| Panel Number | PY-3-FF |
| Site | New Mill_BL_PL20-21_FF_PY (#6517) |
| Plot | 20-21 |
| Position | PY |
| Floor | FF |
| Block | — |
| Length | 2325 mm |
| CDT File | Z:\6517_New Mill_BL_PL20-21_FF_PY\6517_New Mill_BL_PL20-21_FF_PY---89-2477\FRAMEPY-3-FF.CDT |
| Status | Complete |
| Created | 31/07/2026 08:14:23 |
| Completed | 31/07/2026 11:12:45 |
Station Timeline
Framing Station
Printed: 08:14:23
Insulation Boarding
Not yet reached
Nailing Bridge
Arrived: 09:03:14
· Left: 09:38:37
· 2123s
Paper Application
Arrived: 09:38:37
· Left: 11:12:45
· 5648s
Panel Flipping
Not yet reached
Insulation Filling
Not yet reached
OSB Glue Application
Not yet reached
Paper Application 2
Not yet reached
Exit Line to Windows
Not yet reached
All Scan Events
2 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 09:03:14 | Nailing Bridge | Scanner 2 | 6517-PY-3-FF-5 | Entry |
| 09:38:37 | Paper Application | Scanner 3 | 6517-PY-3-FF-5 | Entry |