Panel Information
| Barcode | 6221-EX-14-TF |
| Panel Number | EX-14-TF |
| Site | Charles St (#6221) |
| Plot | — |
| Position | EX |
| Floor | 3rdF |
| Block | — |
| Length | 3162 mm |
| CDT File | Z:\6221_Charles St_-3rdF-3rdF EX\6221_Charles St_-3rdF-140-2787\FRAMEEX-14-TF.CDT |
| Status | Complete |
| Created | 30/06/2026 15:15:23 |
| Completed | 02/07/2026 09:23:09 |
Station Timeline
Framing Station
Printed: 15:15:23
Insulation Boarding
Arrived: 16:12:49
· Left: 07:47:07
· 56057s
Nailing Bridge
Arrived: 07:47:07
· Left: 09:23:31
· 5784s
Paper Application
Arrived: 09:23:31
· Left: 10:47:00
· 5009s
Panel Flipping
Arrived: 10:47:01
· Left: 15:20:31
· 16410s
Insulation Filling
Not yet reached
OSB Glue Application
Not yet reached
Paper Application 2
Arrived: 15:20:31
· Left: 09:23:09
· 64958s
Exit Line to Windows
Arrived: 09:23:09
· Left: 09:23:09
All Scan Events
6 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 16:12:49 | Insulation Boarding | Scanner 1 | 6221-EX-14-TF | Entry |
| 07:47:07 | Nailing Bridge | Scanner 2 | 6221-EX-14-TF | Entry |
| 09:23:31 | Paper Application | Scanner 3 | 6221-EX-14-TF | Entry |
| 10:47:01 | Panel Flipping | Scanner 4 | 6221-EX-14-TF | Entry |
| 15:20:31 | Paper Application 2 | Scanner 7 | 6221-EX-14-TF | Entry |
| 09:23:09 | Exit Line to Windows | Scanner 8 | 6221-EX-14-TF | Entry |