Panel Information
| Barcode | 6221-EX-25-TF |
| Panel Number | EX-25-TF |
| Site | Charles St (#6221) |
| Plot | — |
| Position | EX |
| Floor | 3rdF |
| Block | — |
| Length | 3261 mm |
| CDT File | Z:\6221_Charles St_-3rdF-3rdF EX\6221_Charles St_-3rdF-140-2787\FRAMEEX-25-TF.CDT |
| Status | Complete |
| Created | 01/07/2026 10:31:51 |
| Completed | 03/07/2026 08:20:45 |
Station Timeline
Framing Station
Printed: 10:31:51
Insulation Boarding
Arrived: 11:24:22
· Left: 14:02:24
· 9481s
Nailing Bridge
Arrived: 14:02:24
· Left: 15:05:28
· 3783s
Paper Application
Arrived: 15:05:28
· Left: 15:06:20
· 52s
Panel Flipping
Arrived: 15:06:20
· Left: 09:42:02
· 66942s
Insulation Filling
Not yet reached
OSB Glue Application
Not yet reached
Paper Application 2
Arrived: 09:42:02
· Left: 22:00:17
· 303495s
Exit Line to Windows
Not yet reached
All Scan Events
5 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 11:24:22 | Insulation Boarding | Scanner 1 | 6221-EX-25-TF | Entry |
| 14:02:24 | Nailing Bridge | Scanner 2 | 6221-EX-25-TF | Entry |
| 15:05:28 | Paper Application | Scanner 3 | 6221-EX-25-TF | Entry |
| 15:06:20 | Panel Flipping | Scanner 4 | 6221-EX-25-TF | Entry |
| 09:42:02 | Paper Application 2 | Scanner 7 | 6221-EX-25-TF | Entry |