Panel Information
| Barcode | 6517-PY-2-GF-4 |
| Panel Number | PY-2-GF |
| Site | New Mill_BL_PL24-25_GF_PY (#6517) |
| Plot | 24-25 |
| Position | PY |
| Floor | GF |
| Block | — |
| Length | 2998 mm |
| CDT File | Z:\6517_New Mill_BL_PL24-25_GF_PY\6517_New Mill_BL_PL24-25_GF_PY---89-2249\FRAMEPY-2-GF.CDT |
| Status | Complete |
| Created | 13/08/2026 09:49:45 |
| Completed | 17/08/2026 12:20:36 |
Station Timeline
Framing Station
Printed: 09:49:45
Insulation Boarding
Not yet reached
Nailing Bridge
Arrived: 11:28:08
· Left: 11:56:53
· 1725s
Paper Application
Arrived: 11:56:53
· Left: 12:27:14
· 1821s
Panel Flipping
Not yet reached
Insulation Filling
Not yet reached
OSB Glue Application
Arrived: 12:27:14
· Left: 12:20:36
· 345202s
Paper Application 2
Not yet reached
Exit Line to Windows
Not yet reached
All Scan Events
3 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 11:28:08 | Nailing Bridge | Scanner 2 | 6517-PY-2-GF-4 | Entry |
| 11:56:53 | Paper Application | Scanner 3 | 6517-PY-2-GF-4 | Entry |
| 12:27:14 | OSB Glue Application | Scanner 6 | 6517-PY-2-GF-4 | Entry |