Panel Information
| Barcode | 6221-PY-125-TF |
| Panel Number | PY-125-TF |
| Site | Charles St (#6221) |
| Plot | — |
| Position | PY |
| Floor | 3rdF |
| Block | — |
| Length | 1600 mm |
| CDT File | Z:\6221_Charles St_-3rdF-3rdF PY\6221_Charles St_-3rdF-89-2787\FRAMEPY-125-TF.CDT |
| Status | Complete |
| Created | 02/07/2026 08:10:28 |
| Completed | 02/07/2026 12:13:03 |
Station Timeline
Framing Station
Printed: 08:10:28
Insulation Boarding
Arrived: 08:19:37
· Left: 08:31:59
· 741s
Nailing Bridge
Arrived: 08:31:59
· Left: 09:49:49
· 4669s
Paper Application
Arrived: 09:49:49
· Left: 09:50:23
· 34s
Panel Flipping
Arrived: 09:50:23
· Left: 12:13:03
Insulation Filling
Not yet reached
OSB Glue Application
Not yet reached
Paper Application 2
Not yet reached
Exit Line to Windows
Not yet reached
All Scan Events
4 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 08:19:37 | Insulation Boarding | Scanner 1 | 6221-PY-125-TF | Entry |
| 08:31:59 | Nailing Bridge | Scanner 2 | 6221-PY-125-TF | Entry |
| 09:49:49 | Paper Application | Scanner 3 | 6221-PY-125-TF | Entry |
| 09:50:23 | Panel Flipping | Scanner 4 | 6221-PY-125-TF | Entry |