Panel Information
| Barcode | 6517-EX-2-FF-5 |
| Panel Number | EX-2-FF |
| Site | New Mill_BL_PL24-25_FF_EX (#6517) |
| Plot | 24-25 |
| Position | EX |
| Floor | FF |
| Block | — |
| Length | 2930 mm |
| CDT File | Z:\6517_New Mill_BL_PL24-25_FF_EX\6517_New Mill_BL_PL24-25_FF_EX---219-2472\FRAMEEX-2-FF.CDT |
| Status | Complete |
| Created | 17/08/2026 12:14:55 |
| Completed | 18/08/2026 09:02:29 |
Station Timeline
Framing Station
Printed: 12:14:55
Insulation Boarding
Not yet reached
Nailing Bridge
Arrived: 15:26:45
· Left: 15:47:06
· 1220s
Paper Application
Arrived: 15:47:06
· Left: 07:42:33
· 57327s
Panel Flipping
Not yet reached
Insulation Filling
Not yet reached
OSB Glue Application
Arrived: 07:42:33
· Left: 09:02:29
· 4795s
Paper Application 2
Not yet reached
Exit Line to Windows
Not yet reached
All Scan Events
3 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 15:26:45 | Nailing Bridge | Scanner 2 | 6517-EX-2-FF-5 | Entry |
| 15:47:06 | Paper Application | Scanner 3 | 6517-EX-2-FF-5 | Entry |
| 07:42:33 | OSB Glue Application | Scanner 6 | 6517-EX-2-FF-5 | Entry |