Panel Information
| Barcode | 6517-EX-3-FF-8 |
| Panel Number | EX-3-FF |
| Site | New Mill_BL_PL28-29_FF_EX (#6517) |
| Plot | 28-29 |
| Position | EX |
| Floor | FF |
| Block | — |
| Length | 4199 mm |
| CDT File | Z:\6517_New Mill_BL_PL28-29_FF_EX\6517_New Mill_BL_PL28-29_FF_EX---219-2472\FRAMEEX-3-FF.CDT |
| Status | Complete |
| Created | 02/09/2026 10:33:12 |
| Completed | 07/09/2026 09:38:19 |
Station Timeline
Framing Station
Printed: 10:33:12
Insulation Boarding
Not yet reached
Nailing Bridge
Arrived: 12:18:18
· Left: 12:25:23
· 424s
Paper Application
Arrived: 12:25:23
· Left: 08:02:53
· 70650s
Panel Flipping
Not yet reached
Insulation Filling
Not yet reached
OSB Glue Application
Arrived: 08:02:53
· Left: 12:17:09
· 15255s
Paper Application 2
Not yet reached
Exit Line to Windows
Arrived: 12:17:09
· Left: 12:17:09
All Scan Events
4 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 12:18:18 | Nailing Bridge | Scanner 2 | 6517-EX-3-FF-8 | Entry |
| 12:25:23 | Paper Application | Scanner 3 | 6517-EX-3-FF-8 | Entry |
| 08:02:53 | OSB Glue Application | Scanner 6 | 6517-EX-3-FF-8 | Entry |
| 12:17:09 | Exit Line to Windows | Scanner 8 | 6517-EX-3-FF-8 | Entry |