Panel Information
| Barcode | 6517-EX-2-FF-7 |
| Panel Number | EX-2-FF |
| Site | New Mill_BL_PL28-29_FF_EX (#6517) |
| Plot | 28-29 |
| Position | EX |
| Floor | FF |
| Block | — |
| Length | 3801 mm |
| CDT File | Z:\6517_New Mill_BL_PL28-29_FF_EX\6517_New Mill_BL_PL28-29_FF_EX---219-2472\FRAMEEX-2-FF.CDT |
| Status | Complete |
| Created | 02/09/2026 10:54:44 |
| Completed | 07/09/2026 09:38:19 |
Station Timeline
Framing Station
Printed: 10:54:44
Insulation Boarding
Not yet reached
Nailing Bridge
Arrived: 14:33:22
· Left: 14:38:46
· 324s
Paper Application
Arrived: 14:38:46
· Left: 08:03:04
· 62657s
Panel Flipping
Not yet reached
Insulation Filling
Arrived: 08:03:04
· Left: 10:19:37
· 8193s
OSB Glue Application
Arrived: 10:19:37
· Left: 09:38:19
· 343121s
Paper Application 2
Not yet reached
Exit Line to Windows
Not yet reached
All Scan Events
4 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 14:33:22 | Nailing Bridge | Scanner 2 | 6517-EX-2-FF-7 | Entry |
| 14:38:46 | Paper Application | Scanner 3 | 6517-EX-2-FF-7 | Entry |
| 08:03:04 | Insulation Filling | Scanner 5 | 6517-EX-2-FF-7 | Entry |
| 10:19:37 | OSB Glue Application | Scanner 6 | 6517-EX-2-FF-7 | Entry |