Panel Information
| Barcode | 6517-EX-5-FF-10 |
| Panel Number | EX-5-FF |
| Site | New Mill_BL_PL18_FF_EX (#6517) |
| Plot | 18 |
| Position | EX |
| Floor | FF |
| Block | — |
| Length | 3519 mm |
| CDT File | Z:\6517_New Mill_BL_PL18_FF_EX\6517_New Mill_BL_PL18_FF_EX---219-2472\FRAMEEX-5-FF.CDT |
| Status | Complete |
| Created | 18/09/2026 11:56:09 |
| Completed | 01/10/2026 08:24:55 |
Station Timeline
Framing Station
Printed: 11:56:09
Insulation Boarding
Arrived: 12:36:06
· Left: 13:47:41
· 4294s
Nailing Bridge
Arrived: 13:47:41
· Left: 14:33:21
· 2739s
Paper Application
Arrived: 14:33:21
· Left: 07:35:02
· 234101s
Panel Flipping
Not yet reached
Insulation Filling
Not yet reached
OSB Glue Application
Arrived: 07:35:02
· Left: 08:24:55
· 866992s
Paper Application 2
Not yet reached
Exit Line to Windows
Not yet reached
All Scan Events
4 total
| Time | Station | Scanner | Barcode | Type |
|---|---|---|---|---|
| 12:36:06 | Insulation Boarding | Scanner 1 | 6517-EX-5-FF-10 | Entry |
| 13:47:41 | Nailing Bridge | Scanner 2 | 6517-EX-5-FF-10 | Entry |
| 14:33:21 | Paper Application | Scanner 3 | 6517-EX-5-FF-10 | Entry |
| 07:35:02 | OSB Glue Application | Scanner 6 | 6517-EX-5-FF-10 | Entry |